Idaho: Watershed Turbidity Monitoring

The Myrtle Creek watershed is the principle water source for the small city of Bonners Ferry, ID. An extremely hot forest fire went through most of this watershed in the late summer of 2003. Experts project a high sediment load during spring runoff for this year and perhaps a few years in the future until the watershed "heals." Funds were allocated late in 2003 so the installation had to be done in winter. The Idaho Department of Environmental Quality contracted with Electronic Data Solutions to provide, integrate, and install a system to monitor turbidity and sound an alarm when levels exceed a user-settable threshold.

The selected equipment consists of a CR10X datalogger, an FTS DTS-12 turbidity sensor, a low-band radio from Meteor Communications Corp. (MCC), and solar-charged batteries for power. Installation took place in late January, 2004.

Connect With Us

phone icon
Phone Number
General: (435) 227-9000
location icon
Corporate Address
815 W 1800 N
Logan, UT 84321
send icon
Email Address
sales@campbellsci.com

As a trusted leader in measurement systems for more than 50 years, our top priority at Campbell Scientific has always been to provide the most accurate, reliable data for research and industry.