Structural & Seismic

Products for Long-term, Stand-alone Structural Monitoring

Case Study »  Medway Bridge: Monitoring Deck Movement

Project Summary

Application Type:
Bridge components monitored during reconstruction project

Location:
near Medway Towns, Kent, England

Products Used:
CR10X 

Measured Parameters:
Hydraulic pressure, bridge movement

Controlled Equipment:
Alarms, Automated Voice Callout via Cellphone

Ten Campbell Scientific CR10X dataloggers were used to monitor movement during the repair of the UK's M2 Medway Bridge. The project required a jacking system to be installed at each of the 20 piers, transferring the deck loading from the bearings to allow the reconstruction of the bearing plinths. Each carriageway deck weighed around 1200 tons and once the load was transferred, the jacks were monitored to ensure settlement at any pier didn't exceed 2 mm. At each pier, a group of 10 jacks was linked to a single pump, a pressure transducer in a hydraulic circuit fitted to each pair of jacks with six linear transducers used to monitor the deck movement. The dataloggers were set to trigger alarms and automatically call engineers via mobile phone if movement exceeded preset values.


« Back to Main Page